New transport System for the city of Nur-sultan Lrt. Phase 1 52.35 km

Scope of work:
- track superstructure 52.35 km;
- turnouts 70 sets;
- yard for assembly of rails;
- conductor rail 28,2 km;
- lighting of stations and station-to-station blocks - 17;
- control center - 6-storied building with underground parking;
- DEPOT facilities (14 buildings);
- Erection of structures of pedestrian underpass in finished condition;
- Construction of evacuation platform;
- Laying of cabling;
- System of station support equipment (escalators, elevators).
Dry Port (2015-2016)
Construction of dry port infrastructure in Khorgos Eastern Gateway Special Economic Zone.
Airport Infrastructure Development (2015-2016)

Black-topping of an aircraft parking lot at the business aviation terminal over an area 136,876 sq.m. The project is implemented at the territory of Astana International Airport.