The company has a full range of modern construction machinery and equipment. The vehicle fleet includes more than 200 units of tractor machinery, 500 units of motor vehicles and 2,500 units of track maintenance vehicles. These modern machineries, vehicles and equipment are made in Russia, China and Austria.

The company has purposely purchased high performance specialized vehicles and equipment for construction and rehabilitation of railways and highways.

Read more...

News and Events

На 100% выполнен план!

На 100% выполнен план!

Сегодня на перегоне «Апановка - Казанбасы» работниками Северной дирекции проведено финальное технологическое «окно» InConKZ по укладке пути в этом сезоне.

Read more...

На 95,7% выполнен план по укладке

На 95,7% выполнен план по укладке

За 6 месяцев путевых работ командой InCon KZ обновлено 162 км ж/д, сменено 128 км плетей бесстыкового пути. Балластировка щебнем составила 427 тыс.м3.

Read more...

The plan of August is fulfilled 100%

The plan of August is fulfilled 100%

InCon KZ team renewed 30.3 km of track in the last summer month.

Works included three sections: Passing loop 117 – Atassu and Kyzylzhar – Tuyemoynak in Karagandy region, and Apanovka - Kazanbassy in Kostanay region.


The plan of August is fulfilled 100%

InCon KZ team renewed 30.3 km of track in the last summer month.

Works included three sections: Passing loop 117 – Atassu and Kyzylzhar – Tuyemoynak in Karagandy region, and Apanovka - Kazanbassy in Kostanay region.

Along the line of the Southern Directorate 14.3 km of track was rehabilitated. The Northern Directorate have laid 16 km of new track panel.

From the beginning of works, 145.9 km of track have been renewed by the Southern, Western and Northern Directorates in total in the Southern and Northern Kazakhstan regions.

Read more...

«Integra Construction KZ» LLP PROVIDES THE FOLLOWING SERVICES:

OUR STRENGTHS

NEW PROJECTS

Капитальный ремонт пути 425 km (2018) 209,5 km (2019) 169,1 km (2020)

Капитальный ремонт пути
425 km (2018)
209,5 km (2019)
169,1 km (2020)

Almaty 1 – Shu  RAILWAY LINE 110 km (2015 - 2017)
-Earthworks – 753,669,000 m3;
ballasting of main and station tracks – 354,000 m3;
sub-ballasting – 418,000 m3;
engineering structures – extension of concrete pipes – 48 pcs;
inverted syphons – 6 pcs;
short bridges (5 meter span) – 2 pcs, medium bridges (less than 100 meter span) – 10 pcs, through bridges – 2 pcs.

Almaty 1 – Shu RAILWAY LINE
110 km (2015 - 2017)

ASTANA RAILWAY COMPLEX (2014-2017)

Construction of a 2.55 km long triple-track railway overpass;
construction of a drainable embankment for tracks and service yard (972,000 m3);
laying of a 37.4 km long rail track panel;
construction of power facilities, signalling and communication system, water supply, sewage and heat supply utilities, buildings and facilities. The railway complex will be commissioned by the beginning of Expo-2017 International Exhibition

ASTANA RAILWAY COMPLEX (2014-2017)

ALMATY-KAPSHAGAI HIGHWAY 8 km (2014 - 2016)
Rehabilitation of Almaty-Kapshagai section of Almaty – Ust-Kamenogorsk highway at km 45 – km 53 km;
six-lane highway

ALMATY-KAPSHAGAI HIGHWAY
8 km (2014 - 2016)

Dry Port (2015 - 2016)
Construction of a dry port and infrastructure facilities of “Khorgos East Gates” Special Economic Zone

Dry Port
(2015 - 2016)

ZHEZKAZGAN-SAKSAULSKAYA RAILWAY LINE 547.6 km (2012 - 2016)
23 facilities under reconstruction;
29,418,878 m3 of earthworks;
12 bridges (47 to 140 meter long);
244 culverts; 9 interstations; 18 stops

ZHEZKAZGAN-SAKSAULSKAYA RAILWAY LINE
547.6 km (2012 - 2016)

ARKALYK-SHUBARKOL RAILWAY LINE214.4 km (2012 - 2016)

41 facilities under reconstruction;
13,360,760 m3 of earthworks;
8 bridges (34.5 to 102.6 m long);
122 culverts; power supply facilities, fiber-optical communication lines, signalling and communication system; 2 interstations, 5 stops

ARKALYK-SHUBARKOL RAILWAY LINE
214.4 km (2012 - 2016)

ZHETYGEN-KHORGOS RAILWAY LINE293 km
The national program of accelerated industrial and innovative development. Transport corridor between Europe and Asia. 18,747,000 m3 of earthworks, 5 stations, 9 junctions, 28 bridges, 2 overpasses, 120 culverts

ZHETYGEN-KHORGOS RAILWAY LINE
293 km

OUR CERTIFICATES

1
1
2
Astru
Asteng
Compliance with ISO 14001:2015, ISO 9001:2015, OHSAS 18001:2007 standards
znak tuv
© 2020 «Integra Construction KZ» Limited Liability Partnership. All rights reserved. https://arctika.kz
Tel.: +7 (7172) 69 55 22; Email: inbox@inconkz.com; Adress: Nur-Sultan (Astana) city, Left Riverbank, 12/1 Kunayev str., VP 16 (map)

Please publish modules in offcanvas position.