Nur-Sultan, 12/1 Kunayev str., VP 16 (map)

ACTIVITIES

PROFESSIONAL APPROACH

PROFESSIONAL APPROACH

The company has a full range of modern construction machinery and equipment. The vehicle fleet includes more than 200 units of tractor machinery, 500 units of motor vehicles and 2,500 units of track maintenance vehicles. These modern machineries, vehicles and equipment are made in Russia, China and Austria.

The company has purposely purchased high performance specialized vehicles and equipment for construction and rehabilitation of railways and highways.

Read more...

News and Events

Plan is fulfilled 100 %

Plan is fulfilled 100 %

302.3 km of track panel is laid by InCon KZ team this year. The results are reached by efforts of our branches.

Read more...

Construction of a bypass road in the city of Karaganda

Construction of a bypass road in the city of Karaganda

InCon KZ continues construction of road section of Sortirovka sector by-pass in Karaganda

Read more...

Dam construction in Almaty

Dam construction in Almaty

InCon KZ continues apace the construction of a mudflow check dam in the head of the river Ulken Almaty down the mouth of the river Ayusay.

Read more...

«Integra Construction KZ» LLP PROVIDES THE FOLLOWING SERVICES:

OUR STRENGTHS

NEW PROJECTS

Капитальный ремонт пути 425 km (2018) 209,5 km (2019) 169,1 km (2020)275,3 km (2021)

Капитальный ремонт пути
425 km (2018)
209,5 km (2019)
169,1 km (2020)
275,3 km (2021)

Almaty 1 – Shu  RAILWAY LINE 110 km (2015 - 2017)
-Earthworks – 753,669,000 m3;
ballasting of main and station tracks – 354,000 m3;
sub-ballasting – 418,000 m3;
engineering structures – extension of concrete pipes – 48 pcs;
inverted syphons – 6 pcs;
short bridges (5 meter span) – 2 pcs, medium bridges (less than 100 meter span) – 10 pcs, through bridges – 2 pcs.

Almaty 1 – Shu RAILWAY LINE
110 km (2015 - 2017)

ASTANA RAILWAY COMPLEX (2014-2017)

Construction of a 2.55 km long triple-track railway overpass;
construction of a drainable embankment for tracks and service yard (972,000 m3);
laying of a 37.4 km long rail track panel;
construction of power facilities, signalling and communication system, water supply, sewage and heat supply utilities, buildings and facilities. The railway complex will be commissioned by the beginning of Expo-2017 International Exhibition

ASTANA RAILWAY COMPLEX (2014-2017)

ALMATY-KAPSHAGAI HIGHWAY 8 km (2014 - 2016)
Rehabilitation of Almaty-Kapshagai section of Almaty – Ust-Kamenogorsk highway at km 45 – km 53 km;
six-lane highway

ALMATY-KAPSHAGAI HIGHWAY
8 km (2014 - 2016)

Dry Port (2015 - 2016)
Construction of a dry port and infrastructure facilities of “Khorgos East Gates” Special Economic Zone

Dry Port
(2015 - 2016)

ZHEZKAZGAN-SAKSAULSKAYA RAILWAY LINE 547.6 km (2012 - 2016)
23 facilities under reconstruction;
29,418,878 m3 of earthworks;
12 bridges (47 to 140 meter long);
244 culverts; 9 interstations; 18 stops

ZHEZKAZGAN-SAKSAULSKAYA RAILWAY LINE
547.6 km (2012 - 2016)

ARKALYK-SHUBARKOL RAILWAY LINE214.4 km (2012 - 2016)

41 facilities under reconstruction;
13,360,760 m3 of earthworks;
8 bridges (34.5 to 102.6 m long);
122 culverts; power supply facilities, fiber-optical communication lines, signalling and communication system; 2 interstations, 5 stops

ARKALYK-SHUBARKOL RAILWAY LINE
214.4 km (2012 - 2016)

ZHETYGEN-KHORGOS RAILWAY LINE293 km
The national program of accelerated industrial and innovative development. Transport corridor between Europe and Asia. 18,747,000 m3 of earthworks, 5 stations, 9 junctions, 28 bridges, 2 overpasses, 120 culverts

ZHETYGEN-KHORGOS RAILWAY LINE
293 km

OUR CERTIFICATES

1
1
2
4
5
6
Compliance with ISO 14001:2015, ISO 9001:2015, OHSAS 18001:2007 standards
znak tuv
© 2020 «Integra Construction KZ» Limited Liability Partnership. All rights reserved. https://arctika.kz
Tel.: +7 (7172) 69 55 22; Email: inbox@inconkz.com; Adress: Nur-Sultan (Astana) city, Left Riverbank, 12/1 Kunayev str., VP 16 (map)

Please publish modules in offcanvas position.